AL1 Top Online TuitionSign inCreate a free account

P5 Maths: Rate

What rate questions test at the level of a hard P5 end-of-year paper, the mistakes that cost marks, and a question to try with its working.

This topic paper can't be started on its own now. The free P5 paper tests rate with the rest of the syllabus: create a free account to sit it, with a full report.

Where the marks go in rate

Rate in P5 goes past simple unit rates: car park and taxi charges in steps, water charged at two rates, a tap filling while a hole drains, and machines working together. Each charge has its own first step, and any part of a half hour counts as a whole one.

The mistakes to look for

  • Not charging the part of a half hour
  • Charging the first hour at the later rate
  • Taking an hour as 100 minutes

Try a question on rate

Question 11 (2 marks). Machine A makes 24 toys in 6 minutes. Machine B makes 32 toys in 4 minutes. Both machines start at the same time. How many minutes will they take to make 240 toys together?

  1. 60
  2. 30
  3. 20
  4. 40
Show the answer

(3) 20

Machine A: 24 ÷ 6 = 4 toys a minute. Machine B: 32 ÷ 4 = 8 toys a minute.

Together: 4 + 8 = 12 toys a minute

240 ÷ 12 = 20 minutes

Start with a free paper

A free account opens a full Maths paper at P4, P5 and P6, marked the moment it's handed in, with every mistake explained.

Ask the tutor